Here some details of projects are completed in GIDC Estate Vatva
| A | Project Works | |||
|---|---|---|---|---|
| Sr No. | Description | Phase | Area / Length | Unit |
| 1 | Rcc Road Upgradation | 2 | 6250 | RMT |
| 2 | Rcc Precast Swd Upgradation | 2 | 4836 | RMT |
| 3 | Street Light Network (210 Nos Run By Solar) | 1 to 4 | 1749 | NOS |
| 4 | Water Supply Network | 1 to 4 | 95890 | RMT |
| 5 | Suvarn Van (sv 1 To 8) + Road Side Plantation | 1 to 4 | 193039 | NOS |
| B | Maintenance Work | |||
|---|---|---|---|---|
| Sr No. | Description | Phase | Area / Length | Unit |
| 1 | Asphalt Resurfacing With New Asphalt Roads | 1 to 4 | 44870 | RMT |
| 2 | CC Surface Drain | 1 to 4 | 6305 | RMT |
| 3 | Rcc Precast Swd | 1 to 4 | 2962 | RMT |
| 4 | Margin Area Paver Block and Road Junction | 1 to 4 | 38420 | SMT |
| 5 | Road Swiping By Two Team With 2 Nos Tractor And Cleaning All Gidc Roads and Margin Area Everyday |
1 to 4 | Max 15 Labour Each Team | EVERYDAY |
| 6 | Every Year Swd Cleaning In All Phase | 1 to 4 | 32550 | RMT |
| 7 | Domestic Solid Waste Collection (SWM) | 1 to 4 | 200 | MT/MONTH |